Webster 3 Light 36 inch Weathered Brass Island Light Ceiling Light
Webster 3 Light 36 inch Weathered Brass Island Light Ceiling Light
Discontinued
Choose options for pricing

Webster 3 Light 36 inch Weathered Brass Island Light Ceiling Light

SKU: WBS136WS
  • Non-Returnable

Webster 3 Light 36 inch Weathered Brass Island Light Ceiling Light

SKU: WBS136WS

Discontinued


This item is no longer available, but our Lighting Experts will be happy to help you find something similar that will suit your style, space and budget.

866-344-3875
Live Chat
call and speak with a Lighting Expert

Our Experts Help You Every Step of the Way

Our Lighting Experts can help you find the brand that best suits your style & budget.

  • 150% Price Match Guarantee
  • Info on Our Pro Program
  • Expert Answers to Your Questions
  • Call for Best Pricing

Available 7 days a week, 8am to midnight


866-344-3875


Live Chat

Webster 3 Light 36 inch Weathered Brass Island Light Ceiling Light

Description

As a pendant, Webster casts a smart and tidy glow thanks to its clear glass shade. This industrial-inspired piece offers a subtle radiance and patina thanks to its weathered brass finish. Webster is also available as a semi-flush mount or larger island light.

Product Specifications

Product Information

Brand:
Quoizel
Brand Category:
Island Light
Brand Product Description:
Webster Chandelier
Shipping Method:
Ground
SKU:
WBS136WS
UPC:
611728344385

Electrical and Operational Information

Lamping Included:
Bulbs Not Included
Lead Wire Length:
8 Ft
Primary Number of Bulbs:
3
Socket:
Medium Base
Total Number of Bulbs:
3
Voltage:
120
Wattage Max:
100.00

Dimensions and Measurements

Backplate/Canopy Height:
1
Backplate/Canopy Width:
4.5
Height:
12
Length:
9
Weight:
9.96
Width:
36

Warranty and Specifications

UL Ratings:
ETL Listed

Additional Details

Chain Cord Features:
4 (0.5"D x 6") and 4 (0.5"D x 12") Down Rods
Features:
  • Shade 1 Measurements: 2.75 Top 9 Bottom 7.25 Side
Glass Features:
Clear Glass
Material:
Steel

Product Reviews